spacer
pt / fr
spacer
spacer spacer spacer spacer
spacer spacer spacer
Home
spacer
spacer
spacer spacer spacer spacer
spacer spacer spacer
News & Events
spacer
spacer
spacer spacer spacer spacer
spacer spacer spacer
Press Release
spacer
spacer
spacer spacer spacer spacer
spacer spacer spacer
Workshops and Conferences
spacer
spacer
spacer spacer spacer spacer
spacer spacer spacer
About ECREEE
spacer
spacer
spacer spacer spacer spacer
spacer spacer spacer
Activities
spacer
spacer
spacer spacer spacer spacer
spacer spacer spacer
Target Groups
spacer
spacer
spacer spacer spacer spacer
spacer spacer spacer
Information Centre
spacer
spacer
spacer spacer spacer spacer
spacer spacer spacer
Service Section
spacer
spacer
spacer spacer spacer spacer
spacer spacer spacer
Contact
spacer
spacer
spacer spacer spacer spacer
spacer spacer spacer
Links
spacer
spacer
spacer spacer spacer spacer
spacer

 

RENEWABLE ENERGY FACILITYspacer  

read more


 

On the web

spacer
Twitter
follow us
 

spacer
YouTube
View our videos

spacer
spacer
Home > News & Events 2011/11/29
spacer
spacer
spacer

ECOWAS Renewable Energy Facility (EREF)


spacer


en F
rançais / em Portuguese


THE CALL IS CLOSED


We would like to thank all applicants for their submissions. The second screening and technical appraisal of the concept notes are finalised. ECREEE received 166 concept notes. 25 concept notes did not meet the basic eligibility criteria in the EREF guidelines and were excluded.

The technical appraisal of the remaining 141 concept notes was done according to the established evaluation criteria: relevance, impact, effectiveness, feasibility and efficiency, as well as sustainability.
Each project was appraised by ECREEE and an external evaluation consultant. In each ECOWAS country the projects with the highest evaluation scores were selected. ECREEE tried to keep a balance between the size and needs of the countries and different RE&EE technology solutions.


ECREEE selected 55 concept notes (around 40% of eligible concept notes).
The applicants of the projects with the status "selected" (see project list below) are invited to present a full project proposal according to the EREF guidelines at latest by 29 February 2012. The successful applicants will be informed separately by e-mail.


Concept notes with an appraisal score exceeding 50 points were put on the waiting list.
In case that a selected concept note does not materialize, the next applicant on the waiting list in the respective country will be invited to present a full proposal. ECREEE will try to mobilize additional funding from donors for projects on the waiting list during the next months.


If you are interested to receive the detailed appraisal score for your concept note please write an e-mail to renfacility@ecreee.org at latest by 15 December 2011.
Below you find the final list of received concept notes and the technical appraisal scores.

Results of Appaisal of Concept Notes

spacer 041111 EREF Final Appraisal Report.pdf

pdf, 2,5M, 11/07/11, 270 downloads

spacer 041111 EREF List with Appraisal Results.pdf

pdf, 155,9K, 11/07/11, 326 downloads

spacer 041111 EREF List of Selected Concept Notes.pdf

pdf, 107,6K, 11/04/11, 450 downloads

spacer 041111 EREF Projects on the Waiting List.pdf

pdf, 97,8K, 11/07/11, 198 downloads

Information Gnrale dEREF

spacer EREF Presentation EN.pdf

pdf, 1,6M, 05/31/11, 686 downloads

spacer Press news EREF EN.doc

doc, 581,5K, 05/31/11, 233 downloads

spacer EREF Nota de Imprensa PT.doc

doc, 584K, 05/31/11, 112 downloads

EREF Application Guidelines EN/FR/PT

spacer EREF guidelines EN.pdf

pdf, 1,6M, 11/29/11, 73 downloads

spacer EREF Directives Appel Propositions FR.pdf

pdf, 1,6M, 11/29/11, 61 downloads

spacer EREF Guia de Apresentao PT.pdf

pdf, 1,6M, 11/29/11, 34 downloads

EREF Project Proposals Templates EN/FR/PT

spacer EREF Project Proposal Template EN.doc

doc, 1,1M, 06/01/11, 564 downloads

spacer EREF Modle de Proposition du Projet FR.doc

doc, 1,1M, 06/01/11, 317 downloads

spacer EREF Modelo do Documento de Projecto PT.doc

doc, 1M, 06/01/11, 135 downloads

spacer Annex 2 Time and Deployment Schedule EN/FR/PT.xls

xls, 175,5K, 05/31/11, 421 downloads

spacer Annex 3 EREF budget breakdown sheet EN/FR/PT.xls

xls, 445K, 05/31/11, 406 downloads

spacer Stakeholder Identification Form EN.doc

doc, 245K, 05/31/11, 341 downloads

spacer Stakeholder Identification Form FR.doc

doc, 257,5K, 05/31/11, 256 downloads

spacer Stakeholder Identification Form PT.doc

doc, 259K, 05/31/11, 133 downloads

EREF Contracting and Execution

spacer ECREEE Grant Contract for Projects.pdf

pdf, 276,7K, 05/31/11, 466 downloads

spacer Annex B Payment and Reporting Schedule EN/FR/PT.xls

xls, 173,5K, 05/31/11, 329 downloads


The ECOWAS Renewable Energy Facility (EREF) is managed by the Secretariat of the ECOWAS Regional Centre for Renewable Energy and Energy Efficiency (ECREEE) based in Praia, Cape Verde. The Facility was established with initial support of the Austrian Development Cooperation (ADC), the Spanish Agency for International Development Cooperation (AECID) and technical assistance of the United Nations Industrial Development Organization (UNIDO). ECREEE seeks further partner support for future call for proposals of the EREF.


spacer

spacer

 

  spacer
   



The EREF project manager will be recruited in the course of 2011. In the meantime, questions can be directed in written form to the EREF preparatory team or the responsible National Focal Institution in the ECOWAS coutntry.


ECREEE Secretariat
EREF Preparatory Team:
Mr. Martin Lugmayr, Mr. Ibrahim Soumaila
E-Mail: renfacility(a)ecreee.org


Go to list of National Focal Institutions (NFIs) of ECREEE

 

sms ping monitoring
Related searches:
ecreee concept appraisal project energy
gipoco.com is neither affiliated with the authors of this page nor responsible for its contents. This is a safe-cache copy of the original web site.