cheap nfl jerseys Cheap Jerseys Wholesale NFL Jerseys Custom Man Jerseys Discount packers jerseys sale authentic steelers jerseys nfl jerseys china online
spacer
spacer

Home
Overview
Links

Empennage
Inventory
Vertical Stabilizer
Rudder
Horizontal Stabilizer
AirVenture 2006
Horizontal Stab. Cont.
Elevators
Elevators Part 2
Tailcone

Wings
Main Spar
Main Ribs
Rear Spar/Top Skins
Leading Edges
Fuel Tanks
Fuel Tanks continued
Ailerons
Flaps

Fuselage
25-26:Getting Started
27:Firewall
28:Forward Ribs/Skins
29:Fuse Side Skins
30-31:Steps, Fwd Fuse
32-33:Tailcone, Baggage
34-35:Baggage Door, Etc.
36-37:Brake & Fuel Lines

Finishing Kit
38-39:Brake/Rudder Pedals
40-41:Flaps/Fwd Fuse
42:Cabin Top
Instrument Panel
43:Cabin Cover
45:Doors
Overhead Console
45:Doors (cont)
Door Latch
More Door Work
Landing Gear
Misc. Stuff
Panel Work
Wingtip Lights
Cowl Work

Firewall Forward
Engine Installation

Systems
Instruments
Antennas
Wiring


spacer
Baffling
Click to see the latest entry


Current Status as of 8/5/11

Empennage (170 hours):
spacer spacer spacer spacer spacer
Wings (272 hours):
spacer spacer spacer spacer spacer
Fuselage (324 hours):
spacer spacer spacer spacer spacer
Finishing (644 hours):
spacer spacer spacer spacer spacer
 

Questions or comments...email me

Disclaimer: This site chronicles the construction of my experimental aircraft for my own educational and entertainment purposes. The processes and procedures described herein should not be used as instructions on building any aircraft.


Total Time
1422 Hours
8/5/2011

 

spacer
RV-9A Project


spacer
CNC Router


spacer
AirVenture 2006

spacer spacer spacer spacer spacer spacer spacer
gipoco.com is neither affiliated with the authors of this page nor responsible for its contents. This is a safe-cache copy of the original web site.