11/19/2012 |
Basis for Interim Operation, Area G, Los Alamos National Laboratory |
Peter S. Winokur |
Staff Issue Report |
PDF |
11/16/2012 |
FY 2012 - Performance and Accountability Report |
Peter S. Winokur |
Report to Congress |
PDF |
11/16/2012 |
November 15, 2012 |
|
Technical Document Log |
PDF |
11/8/2012 |
DOE Update on the Status of the Implementation Plan (IP) for Board Recommendation 2010-2, Pulse Jet Mixing (PJM) at the Waste Treatment and Immobilization Plant (WTP) |
Steven Chu |
Letter |
PDF |
11/6/2012 |
DOE will Require an Additional 45 Days to Complete a Response to Board August 8, 2012, Letter which Issued a Reporting Requirement Concerning Deficiencies in the Safety Analysis and the Design of the WTP Slurry Transport System, Hanford Site |
David Huizenga |
Letter |
PDF |
11/5/2012 |
DOE Response to Board June 18, 2012, Letter which Issued a Reporting Requirement Concerning Safety Basis and Quality Assurance at Los Alamos National Laboratory (LANL) |
Thomas P. D'Agostino |
Letter |
PDF |
11/5/2012 |
DOE Response to Board September 6, 2012, Letter which Issued a Reporting Requirement Concerning NNSA's Approach to Validate the Modeling Assumptions at the Uranium Processing Facility (UPF) Main Building, Y-12 National Security Complex |
Thomas P. D'Agostino |
Letter |
PDF |
11/1/2012 |
November 1, 2012 |
|
Technical Document Log |
PDF |
10/31/2012 |
Federal Register Volume 77, Number 211 - Extension of Hearing Record Closure Date |
|
Public Hearing Federal Register Notice |
PDF |
10/31/2012 |
DOE Transmittal of Deliverable 5.5.3.6 of the Implementation Plan for Board Recommendation 2010-2, Pulse Jet Mixing at the Waste Treatment and Immobilization Plant (WTP) โ Third Document |
Scott L. Samuelson |
Letter |
PDF |