First, an initial site visit and interviews with facility operators and occupants will be conducted. During the site visit, the Evaluator shall gather enough information to provide an initial list of Energy Conservation Measures (ECMs) and complete an initial description of the facility and it's supporting mechanical, electrical, and architectural systems.
Next, a detailed site investigation will be performed. During this site visit, a thorough investigation of the energy consuming equipment of the facility will be completed
Finally, a Final Energy Evaluation Report will be provided detailing the overall findings of the project. This Final Energy Evaluation Report shall include general and detailed information gathered in the site visits, an estimation of the overall potential to reduce energy consumption, ECM analysis, and a written sequence of operating changes for low cost and no-cost ECMs.
reEnergize Program
1819 Farnam Street, Suite 311
Omaha, NE 68183
reEnergize Program
2143 O Street
Lincoln, NE 68510
Contact reEnergize »
Toll Free: (877) 402-5111