On May 17, 2012, DOE, Argonne and Clark Construction personnel gathered to celebrate "topping out" the Energy Sciences Building (ESB). Topping out a building is a tradition, originating from Eastern Europe, involving placing the final structural beam at the highest point of the building. In many cases the last beam to be hoisted is painted white and signed by all the workmen involved.

In addition to the customary beam signing and placement the ESB topping out ceremony involved lunch and talks from Drew Martin, Project Manager from Clark, Dave Trolian, Vice President from Clark, Jeff Sims, Program Manager from Argonne, and Dr. Eric Isaacs Laboratory Director from Argonne. Dr. Isaacs discussed with the trades people and project team the importance of the research that will take place within the ESB. Drew, Dave, Jeff and Eric took the opportunity to thank the workers for their outstanding commitment to quality and safety in their respective trades.

The ESB is on schedule for occupancy in Summer 2013.

May 2012

spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer spacer

News

Milestones

Quick Links

spacer spacer spacer

 

Clark Construction hired to construct ESB.

Updated images in the Image Gallery »

 

 

 

Conceptual design contract awarded to HDR, Inc., Nov. 2008.

Conceptual design complete, Summer 2009.

Conceptual design out for DOE approval, Sept. 2009.

Request for bid on preliminary design, Fall 2009.

Contract award for preliminary design, Fall 2009.

Start preliminary design, Fall 2009.

Groundbreaking, June 3, 2011.

Final design complete, 2012.

Building move-in, 2014.

 

 

VIDEO: ESB Safety Video December 2011

Daily Photo Gallery

Documents - Specs and Drawings

ESB Brochure (pdf)

VIDEO: Building Fly-Through

ANL ESB Design Kiosk (ppt)

ANL ESB Sustainability Kiosk (ppt)

Sharepoint: Project Review Documents

Image Gallery

 

spacer spacer spacer

U.S. Department of Energy Office of Science | UChicago Argonne LLC
Privacy & Security Notice | Contact Us | Site Map | Search
gipoco.com is neither affiliated with the authors of this page nor responsible for its contents. This is a safe-cache copy of the original web site.