Cobb County Department of Transportation

DOT Project Listings
last updated February 2012

Project Name Project Number Project Status
Barrett Parkway Thoroughfare Improvements
D4010
Under construction
Big Shanty Extension- GDOT 3 phases
Phase 1 D4020
Phase 2 D4030
Phase 3 D4040

Under construction
Under construction
Complete

Cedarcrest Road Widening D4070 In design
Canton Road Corridor
D6050
Complete
Cobb Parkway - Bridge over Chattahoochee River
GDOT Project
In design
County Line Road
D6070
Under construction
Dallas Highway Enhancement D11C0 Under construction
East Cobb Sidewalks - Multi-use Trails D11G0 Under construction
Floyd Road
TR295
In design
Interstate North Parkway Sidewalks Multi-Use Trails
D11H0 Under construction
I-285 at Atlanta Road Interchange D4100 In design
I-75 at Third Army Road Interchange D4260 In design
Jamerson Road / Wigley Road
D4120/D6120
Under construction
Jiles Road - Phase 3
D4130C
Under construction
Lake Acworth Drive/ SR 92
GDOT Project
In design
Lower Roswell Road (East)
D6140
Under construction
Nance Road Phase II D6160A Under construction
Noonday Creek Trail D11D0/ D11E0 Under construction
Powder Springs Road at Cheatham Hill/Callaway Roads
GDOT Project
In design
Queen Mill Road
D6200
In design
Sandy Plains at East Piedmont Road (GDOT)
D3360
Under construction
Shiloh Road / Shallowford Road
D6220
Deferred
 
Resurfacing Information This list includes all roads in the 5 resurfacing contracts ($16.36 M) that have been recently approved by the Board of Commissioners.


Project Name: Barrett Parkway Thoroughfare Improvements (US41 to Dallas Highway)
Project No.:
D4010
Commission District:
District 1
Last Web Update:
January 2012

Project Description:
This project consists of 3.58 miles, exclusive of side streets, of widening from 4-lane divided roadway to 6-lane divided roadway from approximately 1800 feet south of Burnt Hickory Road to the intersection of Barrett Parkway and Cobb Parkway (US41); includes widening of the existing bridge over Noonday Creek and a 10-ft asphalt multi-use trail; and includes installation and modification of traffic signals and ATMS system.

Project Schedule:
This project is scheduled for completion by summer 2013.

Project Manager Information:
For additional information on this project, please contact the project manager Michael Wright at 770-528-4375

Project Downloads:
Handout spacer
Barrett Parkway at Burnt Hickory BOC Approved Concept spacer
Concept Map 1 - Barrett Parkway South End spacer
Concept Map 2 - Barrett Parkway North End spacer

Video Simulation Indirect Left at Burnt Hickory Intersection



Project Name:
Big Shanty Extension
Project No.:
D4030, D4040
Commission District:
District 1
Last Web Update:
December 2011

Project Description:

Cobb County has begun construction on the much anticipated Big Shanty Extension; a two mile long roadway designed to provide significant congestion relief for the northwest sector of Cobb County. Through the partnership of Georgia Department of Transportation, the Cobb County DOT, the Town Center Area Community Improvement District, Kennesaw State University and the American Recovery and Reinvestment Act, Phase I began construction in January 2010, Phase III began construction in fall 2009 and Phase II is scheduled for construction in 2011. The total project should be completed by Fall 2012.

In 1998, the Town Center Area Community Improvement District, in an effort to relieve congestion on both Chastain Road and Barrett Parkway, began studying the possibilities of a new east/west corridor. Re-connecting the original Big Shanty Road, split by construction of I-75 in the mid 70’s, became the most viable alternative. The Big Shanty Extension project was developed and divided into three phases:
Phase 1 – Barrett Lakes Blvd east to George Busbee Pkwy (under I-75)
Phase 2 – Chastain Road east to Barrett Lakes
Phase 3 – George Busbee Parkway east to Chastain Meadows

When completed the project will provide an alternative to the congested Chastain Road and Barrett Parkway corridors.  The Big Shanty improvements will also include a multi-use trail on the entire length of the project providing a safe pedestrian environment for employees, Kennesaw State University students and visitors in the Town Center area.  The length of the project is 1.98 miles at a construction cost of $18,000,000.

Project Schedule:
Phase I is currently under construction and let to construction by the Georgia Department of Transportation and is anticipated to be completed in Fall 2012.
Phase II is currently under construction with a scheduled completion date of July 2012.
Phase III is substantially complete and open to traffic.

Project Manager Information:

For additional information on this project, please contact the project manager Michael Wright at 770-528-4375.

Project Downloads:

Click here to view Project Flyer which contains maps and detailed information of the project's 3 phases. spacer

spacer



Project Name:
Cedarcrest Road Widening - Cobb and Paulding Counties
Project No.:
D4070
Commission District:
District 1
Last Web Update:
February 2012

Project Description:

Cedarcrest Road is a two-lane roadway that runs approximately 6.27 miles between US 41/Cobb Parkway Northwest in Cobb County and the Dallas Acworth Highway intersection with Hiram Acworth Highway at the Cross Roads community of Paulding County.  The proposed undertaking would widen and improve Cedarcrest Road from Harmony Grove Church Road to Governors Towne Drive. These improvements would be made through two projects—one to be completed by Paulding County’s Department of Transportation utilizing local funding and the other to be constructed by Cobb County’s Department of Transportation utilizing a combination of local funding and federal highway funds.

Project Schedule:
This project is currently in design.

Project Manager Information:
For more information about this project, please contact Cobb DOT Engineering, Scott Jordan, Project Engineer at 770-528-3685.

Project Downloads:
Cedarcrest Fact Sheet spacer
Cedarcrest Road Map - Cobb County spacer
Cedarcrest Road Map - Paulding County south 1 spacer
Cedarcrest Road Map - Paulding County north 2 spacer



Project Name: Canton Road Corridor
Project No.:
D6050
Commission District:
District 3
Last Web Update: September 2011

Project Description:

The limits of the Project extend along Canton Road from the northern terminus of the Canton Road Connector north to the Cobb/Cherokee County line.
The project consists of identifying specific safety and operational improvements to Canton Road and key intersections, improved access management for adjacent properties, continuous sidewalks on both sides of the roadway. This project also includes a raised median between Hembry Drive and Blackwell Square, and other selected locations, based on accident history.

Project Schedule:
The project is currently complete.

Project Manager Information:
For additional information, please contact the project manager Scott Jordan at 770-528-3685.

Project Downloads: spacer
Comment Card
Plan 1
Plan 2
Plan 3
Plan 4
Plan 5
Plan 6
Plan 7
Plan 8
Plan Legend

Click here to view Canton Road Corridor Website


Project Name: Cobb Galleria Parkway Streetscapes Thoroughfare Improvements
Project No.:
TR278
Commission District:
District 2
Last Web Update:
December 2011
Project Description:

The project consists of removing both existing sidewalks and constructing a 12-foot multi-use trail along the east side and constructing a 5-fott sidewalk along the west side. The project also includes extensive landscaping, construction of three retaining walls, modifications to the existing traffic signals, and potential placement of street and pedestrian lighting. The project length is 0.53 miles.
Project Schedule:
Construction began in Fall 2010 with expected completion in Spring 2012.
Project Manager Information:
For more information, please contact project manager Jane Stricklin at 770-420-6664.



Project Name: Cobb Parkway - Bridge Replacement over Chattahoochee River - GDOT Project
Project No.:
D11E0
Commission District:
District 2
Last Web Update:
February 8, 2011
Project Description:

This project includes replacing the bridge over the Chattahoochee River located in Cobb and Fulton Counties, Georgia. To accelerate construction of the new bridge, this project has been split into two phases:
Phase 1: From Northgate Drive to Paces Mill Road. This phase will include reconstruction and widening of the bridge over the Chattahoochee River. The length of this proposed phase is 0.53 miles.
Phase 2: From Mount Paran Road to Northgate Drive. This will widen the existing roadway from 4-lanes to 6-lanes between Mount Paran Road and Northgate Drive.
Project Schedule:
Right-of-way acquisition authorization awaiting final environmental approval, final plans being completed, letting currently scheduled for March 2011.
Project Manager Information:

For more information, please contact Cobb DOT Engineering, Mike Cates, Project Engineer
at 770-420-6659
Project Downloads:
Click here to view Phase 1 PDF spacer
Click here to view Phase 2 PDF spacer
Click here for GDOT Project Handout.spacer
.



Project Name: County Line Road
Project No.:
D6070
Commission District:
District 3
Last Web Update:
November 2011
Project Description:
The purpose of this project is to provide safety improvements and better traffic flow for the County Line Road corridor from Due West Road to Mars Hill Road.
This project consists of approximately 5 miles of roadway improvements on County Line Road between Due West Road and Mars Hill Road. Improvements include reconstruction of 5 intersections, replacement of the bridge over Allatoona Creek, replacement of the culvert north of Burnt Hickory Road, and widening of the existing two-lane roadway, curb and gutter, sidewalk and roundabout at County Line Road at Burnt Hickory Road will also be added.
Project Schedule: This project is under construction with the roundabout construction open to traffic and expected project completion December 2011.
Project Manager Information:
For additional information on please contact the project manager Scott Jordan at 770-528-3685.
Project Downloads:
Please note: Concept plans are very large files; download times will vary spacer
Factsheet spacer (from December 2007 Public Meeting)


spacer
Roundabout Project Fact Sheet spacer (from November 2011)
Link to information about Roundabouts

 

 

 

 

Original Concept plans as of December 2007: spacer
Map 1, Map 2, Map 3, Map 4, Map 5

Revised Concept plans as of April 2009:spacer
Map 1 - Due West to Burnt Hickory
Map 2 - Burnt Hickory (including Roundabout)
Map 3 - Pitner Rd. to Starr Lake Dr.
Map 4 - Starr Lake Dr. to Old Stilesboro
Map 5 - Old Stilesboro Rd. to Mars Hill Rd.

The BOC approved the revised concept plan below at their 04/29/2009 meeting:
County Line Revised Concept Presentation spacer


Project Name: Dallas Highway Enhancement Trail and Streetscape, Phase II Multi-Use Trails
Project No.: D11C0
Commission District: District 1
Last Web Update: December 2011
Project Description: This project consists of a multipurpose recreational enhanced
sidewalk to accommodate pedestrians and bicyclists along SR120/Dallas Highway, from Villa Rica Way to John Ward Road. The length of the project is 0.94 miles and consists of constructing a 12-foot wide pedestrian enhanced sidewalk, curb ramps that comply with Americans with Disabilities Act design standards, and drainage improvements.
Project Schedule: This project is currently under construction with a scheduled completion date of Summer 2012.
Project Manager Information: For more information, please contact Mike Wright at 770-420-4375.




Project Name: East Cobb Sidewalks - Multi Use Trails
Project No.:
D11G0
Commission District:
District 2
Last Web Update:
December 2011
Project Description:
This project consists of approximately 5,500 feet of 10-ft wide sidewalk along the south side of Roswell Road (SR120). The project starts at the southeast corner of Providence Road/ Merchants Walk Drive adn continues east, ending at Shady Hill Road. The 10-ft wide sidewalk, with reductions in width (minimum 7 feet) is designed to avoid existing topographic limitations as needed. Handicap ramps will be placed at intersections along the route to conform to the Americans with Disabilities Act.
Project Schedule:
This project is currently under construction with a scheduled completion date of May 2012.
Project Manager Information:
For more information, please contact John Morey at 770-528-1661.
Project Downloads:
Click here to view project limits. spacer



Project Name: Floyd Road Widening
Project No.:
D11E0
Commission District:
District 4
Last Web Update:
February 8, 2011
Project Description:
Floyd Road is being designed as a 4 lane-divided road way with a 20 feet raised median, from Clay Rd to Hicks Rd. The median will be landscaped and a 10 feet wide enhanced sidewalk will be added on the west side of Floyd Road with a 5 feet grass strip. A 5 feet sidewalk will be added on the east side.
A concept plan has been approved by Georgia Department of Transportation [GDOT]and environmental approval by GDOT is awaited. After that, a public information open house will be held to invite comments from citizens [Spring 2009]. 
Project Schedule:
This project is currently in design. Right-of-way acquisition started Fall 2009 and construction is expected to begin in early 2012.
Project Manager Information:
For more information, please call Mike Wright at 770-528-4375.
Project Downloads:
Click here to view the Floyd Road Corridor concept map. spacer 6.35 MB updated May 6, 2009
Click here to view the Fact Sheet. spacer


Project Name: Interstate North Parkway Sidewalks Multi-Use Trails
CCDOT Project No.:
D11H0
Commission District: District 2
Last Web Update:
December 2011

Project Description:
This project consists of approximately 360 feet of five-foot wide sidewalk on the east side of Powers Ferry Road, and approximately 1,300 feet of ten-foot wide sidewalk on the north side of Interstate North Parkway. Additional improvements include widening the right turn lane to provide an improved radius for westbound traffic on Interstate North Parkway, and extending the merge lane onto Powers Ferry Road to facilitate a more fluid movement for traffic.
Project Schedule: Notice to Proceed November 2011 with Scheduled Completion in Summer 2012
Project Manager Information:
For more information please contact Brian Loudermilk Project Engineer at 770-528-4378


Project Name: I-285 at Atlanta Road Interchange Improvements
CCDOT Project No.:
D4100
GDOT Project No.: PI 752300
Federal Project No.: STP00-0222-01(001)
Commission District:
District 2
Last Web Update:
November 2011

Project Description:
Modify the interchange at Atlanta Road and I-285 by replacing the existing bridge structures and adding left turn lanes along Atlanta Road to access both NB & SB traffic onto I-285; add aux. lanes along I-285 from Atlanta Rd to Paces Ferry Rd interchange and replace Orchard Rd Bridge over I-285.

Project Schedule:

Preliminary Field Plan Review:  February 2011
R/W Acquisition:  FY2011
Let Date:  FY2013
Project Manager Information:
For more information please contact Bryan Ricks Project Engineer at 770-528-4361.
Project Downloads:
Concept Plan as of October 15, 2011 spacer
Public Meeting Handout spacer


Project Name: I-75 at Third Army Road Interchange
Project Numbers:
D4260
Commission District:
District 1
Last Web Update:
October 2011

Project Description:
The purpose of this project is to provide safety and operational improvements, and reduce traffic congestion on those roads that feed traffic from northern Paulding County, Southern Bartow County and northwest Cobb County to and from I-75.  Currently, commuters use US 41 and SR 92 predominately to gain access to the interstate system. SR 92 crosses Lake Allatoona and goes through historic Acworth.  It would be difficult to widen SR 92 to accommodate this traffic.  Due to congestion along these corridors, commuters are taking alternative routes to gain access to the interstate including perceived short cuts through communities.  This has created safety and operations issues as well as congestion on facilities that were not designed to accommodate this degree of traffic.

The Third Army Road project will address these issues by creating a access controlled roadway between US 41 and a new interchange on I-75 that basically follows the existing Third Army Road, hence the name of the project.  This new facility will provide direct access to the area as described above with the new interchange on I-75. A grade separated interchange with US 41 is also being considered to further alleviate potential congestion on US 41.

Project Schedule:
Currently, only the scoping phase is underway with a duration of approximately 18 months.  The deliverables of this phase consists of an approved Environmental document and approved concept.  Upon completion of this Phase, construction plans will be prepared and the project let to construction.  It is anticipated that construction will begin by 2017 and will take two years to complete construction.

Project Manager Information:
For additional information on this project, please contact the project manager Mike Cates at 770-420-6659.

Project Downloads:
spacer Proposed Concept Plan I-75 / Third Army Road (5Mb) Sept. 2011



Project Name: Jamerson Road/Wigley Road/Kell High School Roadway Improvements
Project No.:
D6120
Commission District:
District 3
Last Web Update:
December 2011
Project Description:

The project consists of various improvements for the Jamerson Road – Jamerson Road/Wigley Road area. Jamerson Road will be widened from a 2-lane to a 4-lane divided road from Lee Waters Road to Canton Road. Jamerson Road/Wigley Road will be widened from 2 lanes to 3-lanes from Sandy Plains Road to Lee Waters Road.
The four-lane roadway will transition to a three-lane roadway with right turn lanes at intersections. Kell High School improvements include extension of turn lanes along Lee Waters Road. This project also includes the construction of six retaining walls.
Project Schedule:
This project is currently under construction with expected completion Spring 2012.
Project Manager Information:
For more information, please contact Bryan Ricks, Project Engineer, at 770-528-4361.
Project Downloads:(BOC-approved concept 06/10/ 2008)
Concept Layout 1spacer , Concept Layout 2
spacer



Project Name: Jiles Road, Thoroughfare Improvements (Phase III)
Project No.:
D4130 A
Commission District:
District 1
Last Web Update:
February 8, 2011
Project Description:
This project, broken into 3 phases, will increase the existing capacity and improve operational deficiencies that will provide for better traffic flow on Jiles Road. Phase I includes roadway between Baker Road and Cherokee Street and includes widening to 4 lanes in each direction with a raised median.  This project is complete.
Jiles Road Phase II will include a new bridge (parallel to the existing one) over the railroad to add additional capacity (between Baker Road and moon Station Road).  This project is complete.
Phase III will have improvements between US 41 and the CSX bridge.
Project Schedule:
Phase 1 complete, Phase II complete, Phase III is scheduled to be complete Summer 2013.
Project Manager Information:
For more information, please contact Mike Wright, Project Engineer, at 770-528-4375.
Project Downloads:
Public Meeting Handout spacer
Concept Sheet 1of 4spacer
Concept Sheet 2 of 4spacer
Concept Sheet 3 of 4spacer
Concept Sheet 4 of 4spacer


Lake Acworth Drive/ SR 92 - GDOT Project
GDOT held a Location and Design Public Information Open House on July 8, 2008 for the proposal to widen SR 92 from two to four lanes between US 41 and Cowan Road at I-75. Click here for more info. spacer



Project Name: Lower Roswell Road (East)
Project No.:
6140
Commission District:
District 2
Last Web Update:
December 2011
Project Description:
Safety and operational improvements to Lower Roswell Road from Davidson Road to Timber Ridge Road through the addition of turning lanes, bicycle lanes, sidewalk and a multi-use trail.

This project consists of the addition of sidewalks, trail, and bike lanes along a 2.9 mile portion of Lower Roswell Road, from Davidson Road to Timber Ridge Road. A roundabout is included at the end of the project, where Lower Roswell Road intersects with Willeo Road and Timber Ridge Road.

Project Schedule:

Phase 1: Davidson Road to Waterford Green/start of National Park
Start construction October 2011, Completion October 2012
Phase 2: Waterford Green/start of National Park to Timber Ridge Road/Fulton County line
Start construction, contingent upon approval of National Park permit, approximately March 2012
Completion, 1 year construction duration, approximately Summer 2013

Project Manager Information: For more information please contact Bryan Ricks Project Engineer at 770-528-4361.
Project Downloads:
Please note: Concept files spacer are very large files; download times will vary.
Revised concepts as of October 20, 2008:
map 1 of 5 (Asheforde Dr. to Heyward Sq.)
map 2 of 5 (Davidson Rd. to Sunset Trail)
map 3 of 5 (Heyward Sq. to Hyde Road)
map 4 of 5 (Hyde Road to Richmond Hill)