Passaic River Basin Flooding Petition

Encourage the Federal Government to prioritize the Passaic River Basin in New Jersey as a Presidential priority in the Fiscal Year 2013 budget request to Congress.

Sign the Petition


spacer Putting human suffering and dislocation aside, according to the cost estimates compiled by the Army Corp of Engineers and others, we have sustained economic losses between $3-4 billion dollars over the past six years from flooding in the Passaic River Basin. We note that five of the eight largest floods in at least the last 110 years occured in the last six years.

We, the undersigned, strongly urge our Federal and State elected officials to demand that a solution to the chronic flooding conditions in the Passaic River Basin be made a priority in the Presidential Budget for Fiscal Year 2013.

Your Name (required)

Your Address (required)

Your City (required)

Your Zip (required)

Your Email (required)

Your Phone

Add my name to the Passaic River Basin Flood Task Force.
 Yes No

spacer

  • Share this:
  • Email
  • Facebook
  • Share
  • Digg
  • Print
  • Reddit
  • StumbleUpon

Passaic River Basin Flooding Petition

  • Sign the Petition
gipoco.com is neither affiliated with the authors of this page nor responsible for its contents. This is a safe-cache copy of the original web site.